Energy quantities
Resolve units, utilization and physical boundaries.
2 workspaces- 01Used forTranslate dispatch schedules into settled energy.Open workspace
MW, MWh, Power and Time Workspace
Energy equals average power multiplied by time; divide energy by either known term to solve in reverse.
- 02Used forTranslate utilization into annual output.Open workspace
Capacity Factor and Annual Generation Workspace
Annual generation equals rated MW multiplied by annual hours and capacity factor.
Project development
Interrogate yield and net-export assumptions.
2 workspaces- 04Used forReconcile yield with revenue volume.Open workspace
Gross-to-Net Generation and Loss Waterfall
Apply each loss sequentially to its defined upstream quantity.
- 05Used forSense-check consultant cases.Open workspace
Renewable Yield and P50/P90 Scenario Checker
Under an assumed normal distribution, P90 is P50 reduced by 1.28155 times aggregate uncertainty.
Finance
Test lifecycle cost, coverage and debt capacity.
2 workspaces- 06Used forCompare design cases.Open workspace
Levelized Cost of Energy Workspace
LCOE is present-value lifecycle cost divided by present-value lifecycle generation.
- 08Used forCheck coverage headroom.Open workspace
DSCR and Indicative Debt-Capacity Workspace
DSCR equals CFADS divided by debt service; indicative capacity capitalizes allowable service.
Markets
Connect production volume to captured commercial value.
1 workspaceStorage
Test duration, efficiency and cycle economics.
2 workspaces- 03Used forValidate a BESS duration claim.Open workspace
Battery Duration and Usable Energy Workspace
Duration is delivered usable energy divided by discharge power.
- 09Used forScreen cycle economics.Open workspace
BESS Cycle-Economics Workspace
Cycle margin is efficiency-adjusted spread income less degradation and annual operating cost.
MODEL BOUNDARY
Screen an assumption before commissioning the full analysis.
These utilities support early reasoning, review and communication. They do not replace project-specific engineering, independent yield work, legal or tax advice, lender models, market simulation or investment approval.